A large oil well derrick and oil storage tank stand on Casa Brisa. Watch the crew deploy the OASIS Unit around the site.
Two large RV batteries, a pitched solar canopy, recessed connections, and an 8-inch tank access gap.
Pump target: 32 GPM at 70 PSI. Pump selection and coverage remain provisional. This depicts perimeter wetting, not oil-fire suppression or full-height derrick coverage.